How a build week runs
From a first measurement to a finished listening position
A typical project opens with a walkthrough. We photograph the room, measure the walls, note the power outlets and listen to what the space already does. That visit produces a short scope document with a build order, a hardware list and the dates the crew will be on site, because a home studio build should never feel like a surprise.
Build days follow the bench order: frame first, then acoustic work, then rack and monitor placement, and finally the cable dressing runs that tie everything together. The team keeps a marked-up drawing on site so that every hole and every panel is accounted for, and the client can watch the room take shape without needing to translate trade language.
The closeout visit is the part clients remember. We sit at the finished desk, play a reference track, adjust the monitor stands by a few degrees and hand over a signal map, a rack ledger and a small maintenance card. If something does not feel right in the first weeks, the tune-up visit is already scheduled.
Bench notes for this season
Common requests we are building for right now, pulled from the current job board at the Kingston Road workshop.
Desk rigs squared this monthopen
Panels mounted by measurementopen
Racks loaded and labelledopen
Monitor stands cut to ear heightopen
Looms dressed and documentedopen
Ask about a combined package for a single room and the bench will quote one visit instead of four.